5L30 Congratulations and thank you for purchasing a Rubbermaid storage building. BEFORE YOU BEGIN – BUILDING CODES Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances. BEFORE YOU BEGIN – SURFACE PREPARATION To ensure proper assembly and performance your shed needs to be built on a solid, level surface. A concrete or patio surface, or a treated-wood platform is recommended.
M M J RB RB RB G D C C F E E H L K B Qx25 B Hardware Roof Doors Walls Floor Description A X T FFx8 Part Number Assembly Letter Quantity Front Floor 5L01 A 1 Repeat Floor 5L11 B 2 Repeat Left Side 5L12 C 2 Left Back 5L04 D 1 Repeat Right Side 5L13 E 2 Right Back 5L05 F 1 Front Left Side 5L02 G 1 Front Right Side 5L03 H 1 Wall Connector 5H75 Q 25 Left Door 5L06 / 5L41 L 1 Right Door 5L07 / 5L42 K 1 Door Handle 5L74 T 1 Lock Hasp 5F58
CAUTIONS CARE & USE CAUTION: Always use gloves when using a utility knife. CAUTION: Always use eye protection/safety glasses during assembly. CAUTION: When installing screws, do not overtighten. CAUTION: Drill only through initial panel wall, unless otherwise indicated. • Shed can be cleaned with water and mild detergent as necessary. DO NOT USE ABRASIVE DETERGENTS, MATERIALS OR CLEANING TOOLS. • To maximize your shed’s performance, remove excessive snow and/or leaf accumulation from the roof.
2.0 Floor Installation a utility knife, cut the long side of each wall slot b. Using tab and then use a rubber mallet and screwdriver to B knock it out: • 4 places on Front Floor (A) • 4 places on Repeat Floor (B): middle location • 8 places on Repeat Floor (B): rear location B A a rubber mallet and a. Using screwdriver, punch out B the screw holes along the connection edge of both Repeat Floors (B). 1. B 2. B A B a rubber mallet and screwdriver, knock out the c.
2.1 Floor Installation and align middle position Repeat Floor (B) to Front Floor (A) and install a. Connect Screws (AA) 9 places; keep panels aligned and even while installing screws. HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit. CAUTION: Do not overtighten screws. AA (9) B A and align back position Repeat Floor (B) to middle position b. Connect Repeat Floor (B) and install Screws (AA) 9 places; keep panels aligned and even while installing screws.
3.0 Wall Panel C Installation a screwdriver, punch out the screw holes on the a. Using top of Repeat Left Side (C) 2 places. Screw Holes C C Repeat Left Side (C) into the back position b. Snap Repeat Floor (B). Repeat Left Side (C) upright to prevent it from c. Hold falling (until Left Back (D) is installed).
3.1 Wall Panel D Installation a screwdriver, punch out the screw holes on the a. Using top of Left Back (D) 4 places. Screw Holes D D snaps on bottom of Left Back (D) into b. Connect Left Back (D) into dovetails of Repeat Left Side (C). c. Engage Repeat Floor (B). HELPFUL HINT: Lubricate dovetails with liquid soap.
3.2 Wall Panel E Installation a screwdriver, punch out the screw holes on the a. Using top of Repeat Right Side (E) 2 places. Screw Holes E Repeat Right Side (E) into the back position of b. Snap Repeat Floor (B). E Repeat Right Side (E) upright to prevent it from c. Hold falling (until Right Back (F) is installed).
_E 3.3 Wall Panel F Installation a screwdriver, punch out the screw holes on the a. Using top of Right Back (F) 4 places. Screw Holes F F Right Back (F) onto dovetails of Repeat Right b. Connect Side (E). Align the lap joint between Left Back (D) and Right Back (F). snaps on bottom of Right Back (F) into c. Engage Repeat Floor (B). HELPFUL HINT: Lubricate dovetails with liquid soap.
Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). d. Install Position connectors in slots and slide down to snap in place. D F Install Wall Connectors 1 D 1 F OVERHEAD VIEW Q 2 click 3.4 Wall Panel C (Repeat Left Side) Installation a screwdriver, punch out the screw holes on the a. Using top of Repeat Left Side (C) 2 places.
3-1_B 3-3_B DETAIL SCALE 1/1 the lap joint between back position Repeat Left Side b. Align (C) and middle position Repeat Left Side (C). middle position Repeat Left Side (C) into the c. Snap middle position Repeat Floor (B). C C C 1 C OVERHEAD VIEW 2 C 1 3-4_B AND 3-5_B DETAIL SCALE 1/1 3-6_B AND 3-7_B DETAIL SCALE 1/1 2 click ALIGN ALIGN Wall Connector (Q) 5 places, connecting 2 Repeat Left Sides (C and C). d. Install Position connectors in slots and slide down to snap in place.
3.5 Wall Panel G Installation a screwdriver, punch out the screw holes on the a. Using top of Front Left Side (G) 2 places. Screw Holes G G 3-1_B DETAIL SCALE 1/1 a pilot hole (using 1/8" drill bit) in front lower corner b. Drill at location indicated by screw target. the lap joint between Repeat Left Side (C) and c. Align Front Left Side (G). Note: This pilot hole is to be drilled through both walls.
d. Snap Front Left Side (G) into Front Floor (A). Wall Connector (Q) 5 places, connecting Repeat Left e. Install Side (C) and Front Left Side (G). Position connectors in slots and slide down to snap in place. G C 1 G 2 OVERHEAD VIEW G 1 click Q 1 2 ALIGN ALIGN click 3.6 Wall Panel E (Repeat Right Side) Installation a screwdriver, punch out the screw holes on the a. Using top of the middle position Repeat Right Side (E) 2 places.
3-3_B DETAIL SCALE 1/1 the lap joint between Repeat Right Side (E) and b. Align middle position Repeat Right Side (E). middle position Repeat Right Side (E) into the c. Snap middle position Repeat Floor (B). E E E E OVERHEAD VIEW 1 E 3-6_B AND 3-7_B DETAIL SCALE 1/1 2 click ALIGN ALIGN Wall Connector (Q) 5 places, connecting Repeat Right Side (E) and middle position Repeat Right Side (E). d. Install Position connectors in slots and slide down to snap in place.
3.7 Wall Panel H Installation a screwdriver, punch out the screw holes on the a. Using top of the middle position Front Right Side (H) 2 places. Screw Holes H H 3-3_E DETAIL SCALE 1/1 3-1_B 3-3_B DETAIL SCALE 1/1 DETAIL SCALE 1/1 a pilot hole (using 1/8" drill bit) in front lower corner b. Drill at location indicated by screw target. Note: This pilot hole is to be drilled through both walls. the lap joint between Front Right Side (H) and c. Align middle position Repeat Right Side (E).
d. Snap Front Right Side (H) into Front Floor (A). Wall Connector (Q) 5 places, connecting middle e. Install section Repeat Right Side (E) and Front Right Side (H). H E H OVERHEAD VIEW E H click 1 Q 2 ALIGN ALIGN click 4.0 Roof Panel M (back position) Installation one Repeat Roof (M) onto back section. The overlap edge of roof points toward the back of the shed. a. Install Align tongues on top of back wall to the outside of the roof panel overlap.
raise front edge of roof enough to allow positioning b. Slightly of Roof Brace (RB) onto the side walls as shown. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Repeat Roof (M). M RB Repeat Roof (M) is positioned against the back wall tongues. c. Ensure From outside the shed, install one Screw (AA) at each corner. AA (8) Hold the edge of the roof down firmly at the corners while installing each screw. Install remaining screws into remaining locations of back walls. 1. 2.
4.1 Roof Panel M (middle position) Installation one Repeat Roof (M) onto middle section. The overlap edge of roof points toward the back of the shed. a. Install Align tongues on top of side walls into grooves in roof. M RB raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. b. Slightly Lower the roof onto the walls and align Roof Brace (RB) into pocket in Repeat Roof (M).
sure middle location Repeat Roof (M) is positioned tightly against the back Repeat Roof (M) section. c. Make Install Roof Pins (FF) in four places. If necessary, use Roof Pin Assembly Tool (GG) to pull the roof down. 1. Insert pin in slot. 2. Push all the way through. 3. Rotate head flush with roof. click FF GG Install Roof Pins four places. inside the shed, install four Screws (AA) into the roof at each side wall location. d.
4.2 Roof Panel J (front position) & Door Installation one Front Roof (J) onto front section: roof gable edge toward front of shed. a. Install Align tongues on top of side walls into grooves in roof. J RB raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. b. Slightly Lower the roof onto the walls and align Roof Brace (RB) into pocket in Front Roof (J).
sure Front Roof (J) is positioned tightly against the middle Repeat Roof (M) section. c. Make Install Roof Pins (FF) in four places. If necessary, use Roof Pin Assembly Tool (GG) to pull the roof down. 1. Insert pin in slot. 2. Push all the way through. 3. Rotate head flush with roof. click FF GG Install Roof Pins four places. Left Door (L) and Right Door (K) into hinge openings inside the shed, install four Screws (AA) into the roof d. Install e.
5.0 Finishing Installation a. Install Screws (AA) into 10 locations shown at bottom of wall panels to secure walls to floor. HELPFUL HINT: Pilot holes may be drilled for the screws. CAUTION: Do not overtighten screws.
5.1 Door Finishing Installation Door Handle (T) onto Left Door (L) using four a. Install Lock Hasp (X) into opening on Right Door (K). b. Install Screws (AA). AA (4) T X K click L MAINTENANCE & SAFETY • Periodically check shed to assure it remains stable and the site remains level. • In areas of high winds it is recommended to anchor shed to platform or ground by holes in floor at designated location and secure with the proper fasteners (not included).