Installation Guide
Table Of Contents
- Contents
- 1 About this Installation Guide
- 2 Planning the SC8800-S AP Installation
- 3 Preparing the SC8800-S AP at the Depot and Shipping to the Field
- 4 Installing the SC8800-S AP in the Field
- Installation Components and Constraints
- Deploying the Access Point
- Mounting the Access Point
- Mounting the U-Joint Bracket to the Main Mounting Bracket
- Attaching the Main Mounting Bracket to a Flat Surface
- Attaching the Main Mounting Bracket to a Wooden Pole
- Attaching the Main Mounting Bracket to a Metal Pole
- Mounting the Hook Bracket to the U-Joint Bracket
- Assembling the AP Attachment Bracket and the Access Point
- Attaching the AP Attachment Bracket and AP to the Hook Bracket
- Safety-Cabling the AP
- Mounting External Antennas (Optional)
- Verifying Access Point Operation
- 5 What to Do Next
- Appendix A: Ruckus Wireless-Supplied and Customer-Ordered Parts
- Appendix B: Resetting the Access Point to Factory Default Settings
- Appendix C: Installer Mounting Dimensions
56
Installing the SC8800-S AP in the Field
Verifying Access Point Operation
3. In the Model Specific Control parameter, select ZoneFlex AP. ZoneDirector displays
the External Antenna entries.
Figure 31. Configure the 5GHz antenna gain - ZoneDirector
4. In the External Antenna section:
• Select the External Antenna checkbox.
• Enter the external antenna gain in dBi for the 5GHz antenna(s).
5. Click OK at the bottom of the form to save your changes.
You have configured the 5GHz antenna gain. If you are also configuring the 2.4GHz antenna
gain, then continue with “Configuring 2.4GHz External Antenna Gain”
on page 57. If you
are not configuring the 2.4GHz antenna gain, then continue with “Verifying Access Point
Operation” on page 50.