User Guide

Set Screw on top for
mounting post at
top of radiator
Set Screw on bottom
for mounting post at
bottom of r
adiator
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
Use Cardboard
from Radiator
Packing Carton to
make Template
Please check the contents of the Runtal Versus carton to be
s
ure you have received all of the parts required. Runtal has
made every effort to ensure that all materials required for
mounting your unit have been included, and depending upon
specific installation conditions, you may have parts left over.
The mounting system has been designed for installation by one
person, but you may find an assistant helpful.
STEP 6 FASTEN THE BRACKET SLEEVES TO THE WALL
Using the pr
oper fasteners (either the metal anchors or #8 scr
ews)
attach the mounting sleeves (Par
t D) to the wall. Fasten the sleeves
with the set screw on the top for sleeves at the top of the radiator
and set screw on bottom for sleeves at bottom of radiator.
STEP 5 DRILL HOLES
Drill holes for appropriate anchors in the middle of all four traced
circles. Use of the metal wall anchors will require a 5/16" hole; use
of the 1-1/2
"
screw will require a 1/16" pilot hole.
STEP 2 ATTACH THE FOUR POSTS TO THE RADIATOR
STEP 3 POSITION THE RADIATOR ON THE WALL
STEP 4 DETERMINE WALL CONSTRUCTION
Position the four posts, parts A, B, & C as shown in the diagram on the
right. The placement of the mounting posts is flexible, however it is
recommended where possible that the posts be placed one on each side
of the vertical tubes between the second and third horizontal tubes
from the top and bottom. All four posts supplied with the towel radiator
must be used, half as top supports and half as bottom supports.
To hang the unit either: (1) Ask an assistant to hold the unit against
the wall while you trace the four mounting posts. (2) Measur
e out
the post positions. (3) Make a template by placing the towel radiator
onto a posterboar
d or a lar
ge piece of the carton and tracing the
mounting posts. The template is then taped to the wall.
For solid wood or placement into blocking use the provided #8 x 1-1/2" long
scr
ew with washers, (par
t F). For dr
ywall constr
uction use the included metal
anchors with washers, (part G). Runtal towel radiators are very sturdy and
car
e should be taken that they ar
e secur
ely hung using all four mounting posts.
STEP 1 DETERMINE WIRING
OR
PIPING (IF
OTHER THAN A
PLUG-IN MODEL)
The electrician should start by providing the wiring to the Versus if the
model is electrical. The easiest termination of wires at the radiator is
accomplished using stranded conductors or 14/2 Romex (#12 AWG solid
wire is not recommended because of termination difficulties). If the unit
is hydronic, the plumber should determine the piping configuration.
Versus Installation Sheet.Q6 6/15/07 8:29 AM Page 2