Use and Care Manual
© 2015 Rust-Oleum Corporation V1.0 60784
Concrete Preparation* **
1. Remove oil spots with a scrub brush and Rust-Oleum Heavy Duty Degreaser or Rust-Oleum Cleaner & Degreaser
(sold separately). Scrub thoroughly, then rinse. Repeat as needed.
2. Mix concrete etch (included) with 2 gallons of water until dissolved (DO NOT add concrete etch directly to paint).
Solution contains a mild citric acid (DO NOT use muriatic acid).
3. Pre-wet entire floor using a hose, then remove pooled water. Use a plastic watering can to evenly distribute etch
solution over a 10’ x 10’ section of floor. Scrub vigorously with a bristle brush to loosen dust and dirt. Keep the entire
section wet until it has been etched and rinsed, and then move on to the next section.
4. Once completed, rinse and squeegee entire floor to remove any traces of etch. DO NOT leave pooled water on the
floor. Etch will not discolor driveways or harm grass or plants, if rinsed thoroughly.
5. Rub your fingers over the dry floor. If dust or powder comes off on your fingers, repeat scrubbing and rinsing until floor
is clean. Allow floor to dry completely. Note: If floor is not thoroughly cleaned and rinsed, coating may not adhere
properly.
*Wood Preparation: Using 80 grit sandpaper, sand the wood surface to remove mil glaze, sealers and/or varnishes. Vacuum and wipe
clean with a dry rag and allow to dry completely before coating.
**Tile preparation: Using 60-80 grit sandpaper, completely deglaze the surface. Vacuum and clean the surface with a solvent. Allow to
dry completely before coating.
***Etch process not required for uncoated residential basements or interior concrete floors.
RockSolid Mixing
1. MIX ONLY ONE KIT AT A TIME. Thoroughly mix material in the pouch by shaking it back and forth and squeezing
each side of pouch.
2. Combine the two components Part A and Part B by placing the pouch on the ground and rolling it from Part A side
towards Part B. The pressure created by rolling the pouch will force the middle seal to burst allowing the two
components to mix together.
3. Thoroughly mix the material by shaking the pouch back and forth and squeezing the edges and corners for 2-3
minutes.
4. The product is activated and must be applied within specified timeframes (see Application Chart).
5. Complete steps 1-4 for the second pouch.
6. Once the material is thoroughly mixed, use scissors to cut a corner off of each pouch.
Note: For an increased slip-resistant surface, broadcast Rust-Oleum Anti-Skid Additive (sold separately) as you
coat or install RockSolid Clear Topcoat with anti-slip additive.
RockSolid Application & Instructions
If Temp is 40-75°F:
If Temp is 76-90°F:
Trim edges immediately after mixing Trim edges immediately after mixing
Roll immediately after mixing
Roll immediately after mixing
Pot life after mixing: 1 hour (do not use product after 1 hour)
Pot life after mixing: 45 minutes (do not use product after
45 minutes)
Best results: 12pm (or when temperatures are rising)
Best results: coat early morning (before 9AM)
1. Pour the mixed material from each pouch into separate sides of the RockSolid Marble Tray (included). Add enough
material to partially fill each chamber in the tray.
2. Trim the edges using a good quality synthetic brush; blot along edges with both colors.
3. Use the RockSolid Marble Roller Cover (included) and 9” roller frame to apply coating evenly, with light pressure, to
floor in 3’ x 3’ sections in an “M” and “W” pattern. De-lint roller cover prior to application.
4. Rotate 90 degrees and roll in the opposite direction using short, 6” to 12” strokes. Change roller direction frequently
for best results.
5. Do not over-roll as this may cause the two colors to blend together. Always saturate the roller on the same sides of
the roller pan.
6. Continue this process until the entire area has been coated, adding more material to the pan when necessary.
7. Only one coat is necessary. Product must be used within the pot life indicated (see Application Chart) or gloss and
color may appear uneven.
8. Do not coat over control joints or roll over control joints. Use a flexible control joint fill material if desired.
9. Repeat the above steps for each additional kit.
RockSolid Dry Time & Clean-up
1. Temperature and humidity may affect drying time. Do not walk on coating while it is still tacky. Surface should be
ready for foot traffic in 8-10 hours and vehicle traffic in 24-36 hours, depending upon temperature and humidity.
2. Clean tools and equipment with mineral spirits. Allow unused product to harden in container and discard according to
local regulations.


