How to Guide

TECHNICAL DATA CAB-01
CABINET TRANSFORMATIONS
Form: GDH-770
Rev.: 052115
1
.DESCRIPTION AND USES .
Cabinet Transformations
is a process designed to re-finish
your worn or damaged cabinets with a four step coating
system. Cabinet Transformations is suitable for kitchen and
bathroom, or any other cabinet in your home.
Cabinet Transformations uses a system of an adhesive bond
coat, decorative glaze (optional), and a protective clear top
coat to create a highly durable finish.
Available in 35 finish colors. The color appropriate kit must be
tinted at the paint counter at time of purchase.
The Cabinet Transformations kit includes both an instructional
DVD and printed instructions to aid with the process and
coating application. The kit also includes:
• Deglosser
• Bond Coat
• Decorative Glaze
• Protective Top Coat
• Decorative Glazing Cloths
• Scrub Pads
• Stir Sticks
Items not supplied with the kit which need to be purchased
separately:
• (3) 2" Synthetic Paint Brushes – Premium Quality Angled or
Straight
• (1) 2" Foam Paint Brush (for optional glaze)
• Smooth Painter’s Tape (2" size)
• Drop Cloths
• Plastic Sheeting
• Disposable Gloves
• Lint-Free Rags
• Disposable Paint Containers
Suggested Items Needed:
• Screwdriver or Cordless Screwdriver
• Plastic Wood Filler and Putty Knife (if filling hardware holes)
• Plastic or Cork Bumpers
• Plastic Cups or Baggies (for hardware)
• Sketch Paper and Marker
..PRODUCTS .
CABINET TRANSFORMATIONS
Small Kit Large Kit Description
258240 258242 Dark Kit (for dark color finishes)
258109 258241 Light Kit (for light color finishes)
263231 ---------- Espresso
263232 ---------- Pure White
263233 ----------- Cabernet
.PRODUCT APPLICATION .
Watch the entire instructional DVD and use the printed
instructions for the complete, step by step, procedure on
application of the materials.
.PRODUCT APPLICATION (cont.) .
IMPORTANT: Apply when air (ambient) temperature is 50-
90°F (10-32°C) and relative humidity is below 60%.
SURFACE PREPARATION
To obtain best results, take cabinet doors off hinges and
drawers out of frames. Remove all cabinet hardware,
including hinges, drawer pulls, and knobs. The surface of the
cabinets must be completely cleaned and de-glossed in
accordance to the instructions to ensure proper performance
of the Cabinet Transformations.
APPLICATION OF DEGLOSSER
To ensure optimum results and maximum adhesion of the
Bond Coat, make sure to be THOROUGH in deglossing the
cabinet doors, drawers, and frames.
IMPORTANT: When deglossing wooden cabinetry, follow the
grain pattern of the wood. Avoid scrubbing in a circular motion.
Wipe up any spilled Deglosser with a clean cloth.
APPLICATION OF BOND COAT
The Bond Coat is formulated to provide maximum adhesion to
wood, laminate, and melamine surfaces. Two coats of Bond
Coat are recommended.
IMPORTANT: There is enough Bond Coat to cover the outer
cabinet frame, each drawer front, and front and back of each
door with two coats. There is not enough to coat the insides of
the cabinets or shelves.
APPLICATION OF DECORATIVE GLAZE (optional)
The Decorative Glaze enhances the look of the cabinets by
accenting the Bond Coat color giving a high-end, custom look.
Thoroughly stir the Decorative Glaze using a stir stick.
Working in cabinet door, drawer or frame sections, use a 2”
synthetic brush or 2” foam brush to liberally coat the surface
with Decorative Glaze. Be sure to coat all corners, crevices,
and raised panel sections. Using the Decorative Glazing
Cloths, wipe the surface in the direction of the grain to remove
the glaze to your desired look. If dissatisfied, while wet, wipe
completely clean with a damp cloth and repeat the glazing
process. Allow the Decorative Glaze to dry for a minimum of 8
hours before applying the Protective Top Coat.
APPLICATION OF THE TOPCOAT
The topcoat is formulated with self cross-linking technology
that provides superior stain and scratch resistance.
IMPORTANT: The Protective Top Coat dries quickly. For best
results, avoid re-brushing previously coated areas that have
started to dry.
Allow to dry 12 hours before installing cabinet drawers and
hardware. Allow 24 hours before full use. Avoid using
cleaners on new cabinetry for 7 days.

Summary of content (2 pages)