Installation Guide
DIY DOOR SYSTEM Assembly Instructions
11
1-5/8”
1/2”
Door Height
Figure 1
Figure 2
FIRST THINGS FIRST
Check to see if the oor below the track area is level. If the oor rises more than 1/2” the door may rub or 
not slide open completely. If the oor is not level, measure from the highest point of the oor surface to 
the recommended track placement and adjust track placement accordingly.
Ensure the track will be installed onto wall studs. If wall studs are not lining up with the installation a 
header will be required to provide the necessary strength and stability for the track and door. 
TRACK & DOOR INSTALLATION
2. Using a level and a pencil, make a line above 
the doorway the same length as the track.
3. Hold the track up to where the pencil line is 
visible through the holes in the track (Figure 2). 
SUGGESTION:
Use pieces of double stick tape on the back of 
the track to help hold the track in place while 
completing steps 2 and 3. 
4. Mark an intersecting line in the center of 
each track hole (Figure 2).
5. Take the track down, remove double stick 
tape (if used) and set the track aside.
1. To determine where the track should be 
installed, rst measure the height of the door, 
then add 2-1/8” to the door length. 1/2” will be 
for the clearance between the bottom edge of 
the door and the oor. 1-5/8” will be from the 
top edge of the door to the center of the track. 
(Figure 1).










