Manual

11.2014
For customer support please visit www.ryvyr.com or call 866.395.8112 weekdays 8:00 to 5:00 EST or fax 866.395.8113 any time
INSTALLATION INSTRUCTIONS
KENT
LINEN TOWER
LT-KENT-ST-18BE / LT-KENT-ST-18WW
TM
SUGGESTED TOOLS AND MATERIALS
Phillips Screwdriver Level Drill Tape Measure Safety Glasses
10'
THANK YOU FOR CHOOSING RYVYR
Please take a few minutes to review this manual before you start installation. If you
encounter any installation problems, please don’t hesitate to contact us. Before you begin,
please observe all local building codes. Unpack the new product and inspect for damage.
The appearance of your linen tower may differ from the illustrations in this guide. These
instructions still apply. Please ensure the finished wall is straight and plumb and the floor
is flat and perpendicular to the finished wall.
ROUGH-IN DIMENSIONS
12″ [304.8mm] 12.5″ [317.5mm]
33″ [839mm]
26″ [660.4mm]
14″ [355mm]
19″ [483mm]

Summary of content (2 pages)