Product Manual A

PARTS LIST
A: Top Pole Section (20” Straight Pole) (1) B: Pole Sections (53 1/2” Swedged Pole) (3)
C: Pulley Topper, Pulley Wheel, Nut, Bolt (1) D. Rope Cleat (1)
E: 22 Ft. Nylon Rope (1) F: Rain Guard with 2 Snaps(1)
WARNING!
DO NOT ERECT POLE NEAR ELECTRICAL WIRES!
RP19
012009v8
1. Determine site for pole, 30 to 40 feet from trees and other obstructions. Dig
a 12-inch diameter hole, 20-inches deep. Pour 2 inches of concrete into the
hole and allow to dry overnight. After concrete sets, insert a SWEDGED Pole
Section (B) into center of the hole - the SWEDGED
PART OF POLE UP.
Plumb pole section. Fill hole OUTSIDE of the POLE with concrete or
QuikCrete - following product’s directions. Allow concrete to harden
completely.
2. After concrete has completely hardened, add a swedged pole section (B) onto the top
of the standing pole section.
3. IF USING AN S&K PRODUCT that slides over a round or square pole, slide the
product over the two standing pole sections at this time.
4. Assemble the pulley by pushing the screw through the
topper and pulley wheel, and screw into the accompanying
nut until tight.
SITE PREPARATION
A
B
C
D
E
IF ANY ITEMS ARE
DISCOVERED MISSING,
CALL
1-800-764-8688
DO NOT RETURN TO STORE.
1. 9 R OUND POLE
INSTRUCTIONS
Swedge
at Top!
F

Summary of content (2 pages)