User's Manual
SAFFreeMile5.8GHzFODUUserGuide•Rev.1.0•Softwareversion6.77
©SAFTehnikaJSC2011
19of48
ThischapterprovidesinstructionshowtoinstallaPointtoPointlink.APointtoPointlinkoperatesinpairsof
twounitswiththesameconfiguration.Bothunitsmustbeinstalled,andtheantennasalignedformaximum
throughput.
MountingtheFreeMile5.8GHzMIMOUnit
TheFreeMile5.8GHzMIMOunit’smountingbracketisdesignedtomakeinstallationonapipeeasy.Theunit
isattachedandit'spositionisfixedwithbolts.
Figure18–AttachingSAFFreeMile5.8GHzMIMOwithintegratedantennatothemast
Fig.4(1).Preparethemountingbracketandnecessarytools:wrench(10mm),nuts,screwsandclampsas
showninthefigure.
Fig.4(2).Adjustthemountingbrackettothepoleasshowninthefigure.Thesmallestpartofthemounting
bracketshouldnotbeattachedinthisstage.
Notethatthemountingbracketsupportspolediameterintherange32‐130mm.
Fig.4(3).AttachtheFreeMile5.8GHzMIMOunitwithintegratedantennatothemountingbracket.The
groundingcableshouldalsobeattachedatthisstage.Thesmallestpartofthebracketshouldbeattachedat
thismoment
fromthebacksideofthemountingbracket.
Fig.4(4).Theantennacanbealignedbylooseningthescrewsmarkedinredcircles(elevationdirection)andin
bluecircles(azimuthdirection).Afterthesignalvaluesduringthealignmenthavepeakedsecurethescrews
using10mmwrench.
FreeMile5.8GHzMIMOLinkEstablishment