User's Manual
Table Of Contents
- Chapter 1: OVERVIEW
- Chapter 2: INSTALLATION
- Chapter 3: WEB GUI
- Initial configuration
- Over The Air
- Networking
- Performance
- System
- FW ( Firmware upgrade
- Configuration ( IP configuration
- Configuration ( SNMP configuration
- Configuration ( Configuration file
- Configuration ( System configuration
- Diagnostic ( Loopback configuration
- Diagnostic ( Download troubleshooting file
- Tools ( License management
- Tools ( Console
- About ( About System
- About ( Copyright
- Chapter 4: INTERFACES
- CONTACTS
INTEGRA User Manual INSTALLATION
17
5
Each notch corresponds to one degree of
azimuth angle. Half distance between notches
(each lip) corresponds to 0.5 degree.
6
Fix azimuth angle on horizontal axis by
adjusting position of flange nuts [9] on both
horizontal and vertical alignment eye screws.
7
When alignment is finished tighten screws
marked with red dots on the right side view of
mounting bracket: hex flange nuts and bolts of
azimuth and elevation eye screws, right side
screw on Integra FODU and hex flange bolt on
azimuth angle indicator with torsion 20..25
N·m.
8
Additionally tighten following screws marked
with red dots on the left side view of mounting
bracket: left side screw on Integra FODU and
two hex flange bolts between both mounting
bracket clamps for housing and pipe with
torsion 20..25 N·m.
Integra-S FODU: attaching to the antenna
Parts of Integra-S FODU: 1 – O-ring; 2 – flange protecting sticker; 3 – wire handle; 4 –
fixation clamps; 5 – grounding screws.
Tools required: Size 5 allen wrench
Level (not supplied)
3
4
1
2
5
SAF Tehnika JSC