Operation Manual

Installation
1-9
Operation Setting your
machine
Getting startedDirectoryMaintenanceSafety ContentsInstallation
INSTALLATION OF THE TERMINAL
Installation of the base and the equipped interface
Set the base down vertically, and insert
the columns of the equipped mechanical
interface into their respective openings.
Screw in and tighten the 8 mounting
screws
.
Take hold of the upper part of the
interface and set the assembly upright
.
Optional equipment:
Place the additional paper tray on the
base, positioning it on its locating pins.
You can install up to three additional
paper trays.
Optional equipment:
Place the duplex unit on the additional
paper tray, positioning it on its locating
pins
.