Installation manual

TORQUE
ITEM OPERATION
Retrieve the take-off alternator harness. Set the harness on the work
bench (stretched out). The 3 attachment clips taped to the harness (2
for the fuel rail, 1 for the bulkhead) will need to be moved towards the
battery ring terminal 9.5".
NOTICE: Repeat OPERATION 20 to OPERATION 40 for each of the
3 clips on the alternator harness.
To move the clips, first find the center of each clip. Measure back
towards the battery ring terminal 9.5". Mark that spot on the harness
with a marker. Repeat for all three clips.
Start with the clip closest to the battery ring terminal. Look at the
orientation of the clip (the clip will be orientated the same when it is re-
attached to the harness). Carefully cut the clip free from the alternator
harness, and remove any excess electric tape.
Line up the clip with the marker marking from OPERATION 20
. Make
sure the orientation of the clip is the same as it was before being
removed. Re-attach the clip with electric tape.
ITEM PART NUMBER QTY. DESCRIPTION
TORQUE
NOTES:
PROCESS PAGE
MODIFY ALTERNATOR HARNESS
2009 VEHICLES
32
20
30
10
40
C
EACH CLIP NEEDS TO BE MOVED TOWARDS THE
BATTERY RING TERMINAL - 9.5"
10
BATTERY RING
TERMINAL
30
9.5"
9.5"
9.5"
LINE UP CENTER OF EACH
CLIP WITH EACH PAINT
MARK ( OPERATION 20
)
40