Instructions / Assembly

4C Recessed Mounted Horizontal Parcel Lockers – Connector Kit
Front and Rear Loading Installation Instructions
Rough Opening
Height: See chart on page 7.
Width: To establish the size of the rough opening(s) in the
wall(s) you will be installing your parcel locker configuration(s)
into, calculate the overall width of the total amount of units per
wall installation; then subtract 3/4” from the width grand total.
Example: (2) double-colum mailboxes are to be installed.
• Each unit is 31-1/8” wide x 2 units = 62-1/4”
• 62-1/4” - 3/4” = 61-1/2” required for rough opening.
STEP 1
Place the first unit into the rough opening (see figures 1A and 1B below).
Page 2 of 7
Front Loading
Units with Carrier
Access Door
Figure 1A
Rear Loading Units
without Carrier
Access Door
Figure 1B
Connector bar
corresponds to
unit height
Hardware required for installation
-Connector #8 x 1/2” pan head self
tapping machine screws (provided
with each 4C Connector Kit)
-#8 square drive x 2” long
wood screws
(provided with parcel lockers)
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 11, 02/10/2017)