Installation Guide

Roadside Mailboxes – 4325
Deluxe Arm Post Installation Instructions
U.S.P.S. APPROVED
Installing Arm(s) on Deluxe Mailbox Posts
Thank you for selecting Salsbury’s deluxe mailbox post. We are confident
that the quality and construction of the post will prove to be a good
investment. This instruction sheet is for assembling the 1-sided or 2-sided
deluxe mailbox post. Other instructions are available for installing the 4325
mailbox direct to a standard pedestal on a 2-wide or 3-wide spreader or a post
in a concrete footing.
4370 – 1 Sided
First check to see that all the parts and fasteners in the carton have been
located and identified according to the illustration below. Also refer to the
illustration below to position the parts correctly.
1. Attach the small right-angle bracket to the post with the long leg on top with
two (2) 5/16” x 1” long hex washer-head bolts.
2. Attach the long square-tube arm to the small right angle bracket with two
(2) 1/4”-20 x 1/2” long flat-head socket screws.
3. Attach the large decorative arch to the post and the long arm with four (4)
5/16” x 1” long hex washer-head bolts.
4. Attach the other small right-angle bracket with the long leg on the bottom
with two (2) 5/16” x 1” long hex washer-head bolts.
5. Attach the short square-tube arm to the small right-angle bracket with two
(2) 1/4’-20 x 1/2” long flat-head socket screws. This completes the assembly.
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2010 Salsbury Industries. All rights reserved.
4370 Assembly
When you install a curbside or roadside mailbox, make sure that it is easily
accessible to the mail carrier. By regulation it should be 41” to 45” from the
ground or street surface up to the inside floor of the mailbox. The door should
be set 6” to 8” back from the front face of the curb or the road edge.
However, check with your postmaster to ensure that the mailbox is installed
according to local regulations.
4372 – 2 Sided
First check to see that all the parts and fasteners in the carton have been
located and identified according to the illustration below. Also refer to the
illustration below to position the parts correctly.
1. Attach the small right-angle bracket to the post with the long leg on top with
two (2) 5/16” x 1” long hex washer-head bolts.
2. Attach the long square-tube arm to the small right angle bracket with two
(2) 1/4”-20 x 1/2” long flat-head socket screws.
3. Attach the large decorative arch to the post and the long square-tube arm
with four (4) 5/16” x 1” long hex washer-head bolts.
4. Repeat steps 1 through 3 above for the second arm on the other side of the
post. This completes the assembly.
General Note:
Use the four (4) hex-head bolts provided to install the mailbox
to the deluxe post. The nylon spacers install between the bottom of the 4325
mailbox and the top of the deluxe post arm.
4372 Assembly