Installation Guide

SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering
@lockers.com
Salsbury Industries assumes no product assembly or installation liability. Copyright © 2016 Salsbury Industries. All rights reserved. (Rev. 02, 05/05/2016)
Bulk Storage Racks9700 Series
Assembly Instructions
Thank you for selecting 9700 series bulk storage racks. We are confident that the quality and construction of the racks will prove to be a good investment. These
instructions are intended to assist you in assembling the racks. The bulk storage racks should be placed in the installed location and anchored to the floor, wall, or to
both. Individual job conditions will dictate the type of anchor fasteners.
Preliminary Notes
Please read the complete assembly instructions and review all illustrations
before attempting to assemble the racks. Check the parts to be sure there
are none missing or damaged.
Tools Required
Flat-blade screwdriver, soft-headed mallet, tape measure.
Assembly
1. Assemble the long side of the bulk storage racks unit by laying two (2)
uprights on the floor with the narrow part of the keyholes in the uprights
facing the same direction. The narrow part of the keyways will point towards
the floor when the bulk storage racks is fully assembled and positioned
upright. Separate the uprights the distance of one long shelf beam (48, 72 or
96 inches).
2. Lay one long shelf beam at one end (bottom) of the uprights, and a
second long shelf beam at the other end (top) of the uprights placed on the
floor in step 1. Next install the two (2) long beams into the uprights by
inserting the two (2) beam rivets at each end of a long beam through the
accompanying keyhole in the uprights. Tap the long beams into place with a
mallet making sure to secure the beam rivets into the narrow part of the
keyways. Lay a third long shelf beam at some predetermined middle
position. Use the tape measure to check that each middle position shelf end
will be at the same distance from an end of the uprights. Insert the beam
rivets on each end of the long beam through the accompanying keyholes in
the uprights then tap the long beam into place making sure to secure the
beam rivets into the narrow part of the keyways.
3. Repeat steps 1 and 2 to assemble a second long side of the unit. Make
sure that the middle position shelf beam is at the same location along the
uprights as the one in steps 1 and 2.
4. Stand the two (2) assembled long frames upright making sure the narrow
part of the keyways are pointing downward. This may require two people.
5. Install three (3) short shelf beams at each long beam location assembled
in steps 1 and 2 by inserting the two (2) beam rivets at each end of the short
beams through the accompanying keyhole in the uprights. Tap the short
beams into place with a mallet making sure to secure the beam rivets into
the narrow part of the keyways. Repeat on opposite side.
6. Install three (3) shelf supports at the mid point of each long shelf beam by
inserting screws provided through the pre-drilled holes in the long beams and
shelf supports. Attach a wing nut provided to each screw and tighten
securely with the screwdriver.
7. Install the three (3) particleboard shelves (not shown) by locating one
each on top of the shelf beams. The assembly is now complete.
KEYHOLE
TWO
BEAM
RIVETS
SHELF
BEAM
UPRIGHT
SHORT
SHELF
BEAM
LONG
SHELF
BEAM
SHELF
SUPPORT
SHELF
BEAM
SCREW
SHELF
SUPPORT
WING
NUT
SHELF
BEAM

Summary of content (1 pages)