Installation & Assembly

Designer Locker Options
Installation Instructions
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering@lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2016 Salsbury Industries. All rights reserved. (Rev. 06, 08/17/2016) Page 5 of 8
Vertical Corner Filler and Flat Top Corner Filler
Vertical corner fillers are comprised of a 3” and a 2” wide piece, each
72” long. Install the vertical corner filler pieces by vertically
overlapping the 3” wide piece beyond the 2wide piece as shown in
the illustration. Fasten the pieces to the lockers by installing screws
from inside the lockers into the vertical corner fillers. Install optional
48” long cleats for greater stability by installing screws from inside the
lockers into the cleats. Install two 12” long cleats 1/4” from the top
edge of the lockers by installing screws from inside the lockers into the
cleats then install two additional cleats at the same elevation onto the
wall. Fasten the flat top corner filler to the cleats with liquid nails (or
similar product). Notch the flat top corner filler to fit behind the vertical
filler. #8 x 1-1/4screws are provided for installation of the vertical filler
and cleats.
Vertical Corner Filler and Sloping Hood Corner Filler
Vertical corner fillers are comprised of a 3” and a 2” wide piece, each
72” long. Install the vertical corner filler pieces by vertically
overlapping the 3” wide piece beyond the 2wide piece as shown in
the illustration. Fasten the pieces to the lockers by installing screws
from inside the lockers into the vertical corner fillers. Install optional
48” long cleats for greater stability by installing screws from inside the
lockers into the cleats. Install two 12” long cleats 3/4” from the top
edge of the sloping hoods by installing screws into the cleats and
through the sloping hoods then install two additional cleats onto the
wall to support the sloping hood corner filler. Fasten the sloping hood
corner filler to the cleats with liquid nails (or similar product). #8 x 1-
1/4” screws are provided for installation of the vertical filler and cleats.