10 Decommissioning
10.1 Decommissioning Steps
1. Switch off the AC grid;
2. Switch Off the DC switch;
3. Wait 5 minutes;
4. Release the DC connectors;
5. Release the AC connectors.
Now inverters can be demounted safely.
10.2 Package
Please pack the inverter with the original package as far as possible. If original package is not available,
use an equivalent carton that meets the following requirements:
1. Load more than 50 kg;
2. With handle;
3. Can be fully sealed off.
10.3 Storage
Store the inverter in dry place where temperatures are between -25 °C - +70 °C.
10.4 Disposal
Please deliver inverters and packing materials to a suitable space where should meet disposal regulations
for electronic scrap at the end of its service.
11 Technical Data
11.1 Input (DC)
optional
60/100
Model
SolarRiver
3400TL-D
SolarRiver
4000TL-D
SolarRiver
4500TL-D
SolarRiver
5000TL-D
SolarRiver
5200TL-D
Max.PV power[W]
Max.DC voltage[V]
Max.input current[A]
Number of MPP
trackers/strings per
MPP tracker
Max power of Track1
/Track2[W]
MPP voltage range
(at rated power)[V]
DC Switch
Shutdown voltge/
Start voltage[V]
3400
10.5/10.5
2200/2200
160~500 165~500 165~500 175~500 175~500 210~500
2500/2500 2750/2750 3000/3000 3100/3100 3500/3500
2/1
12/12 13.5/13.5 15/15 15/1515/15
4000 4500 5000 5200
SolarRiver
6000TL-D
6000
550