User's Manual
Chapter 2 Installing System
RFD01P Series Installation Manual v1.0 xl
Copyright © 2017, All Rights Reserved.
Fixing Wall Type
Marking and Drilling for Wall Mounting
To mark on a wall
1 Make sure you have the following items:
Table 14. Tools for Marking
Category
Description
Working Tools
Tape Measure, Permanent Maker, Level
To mount the system on a wall, perform the leveling test by referring to System
Leveling to check the positions are marked to be horizontal or vertical before
drilling. If the result shows they are not horizontal or vertical, modify the marking
positions.
When the position where the system will be placed is determined, place the system
on that position and then mark the positions where anchor bolts will be fixed. This
will reduce marking error range.