User's Guide

Installation & Methods
MBTS
35463.DOC Samsung Telecommunications America Wireless Systems Lab
ID: Rev: Confidential and Proprietary Page 26 of 32
Site Grounding
Yes No Description Comment
Tower existing or new?
Shelter existing or new?
Upgrade?
Soil type (rock, normal etc..)
Meg test (5ohm min.) required?
Isolated ground plane
Connecting method
Grounding installation requirements
Site Electrical
Yes No Description Comment
Existing (100amp or 200amp?)
F&I service pole
Distance to shelter
F&I generator (size)
F&I fuel system (type)
Tank Required (Size 250/ 500gal?)
Commercial Power Company
Site & Civil
Yes No Description Comment
Clear & Grub Site Area
Access Road (width & length)
Regrade road?
Site Fencing (height)
Anchor Fencing (type, walk gate ?)
Site Gravel & Weed Barrier
Site Clean-up
Comments