Samsung CDMA BSS: Indoor BTS Installation Manual
12
BSS Version 4, Document V4D0001 release 0.5, Indoor BTS Installation
Manual, release 2.0
2 Take the four eyebolts from the packing material and install onto the
rack being lifted.
3 Have the operator lower the lifting straps to ground level.
4 Snap the hooks of the four straps to the eyebolts. Also fasten
guidelines if required.
5 Have the operator lift the straps until they are taut.
6 Personnel should signal the operator to start the lift after they station
themselves at the installation site.
7 Allow the operator to lift the crate to the required location. Help to
guide the crate as close to the installation location as possible.
8 After the crate has been lowered onto the surface, remove the hooks
and guidelines from the rack.
9 Inspect the rack and report any damage to the crane operator and
site manager.