User's Manual

Table Of Contents
Samsung CDMA BSS: Indoor BTS Installation Manual
18
BSS Version 4, Document V4D0001 release 0.5, Indoor BTS Installation
Manual, release 2.0
5 Position the rack so no contact occurs between the anchor bolts and
the base of the rack:
6 If contact occurs replace any broken spacers/bushings.
7 Tighten the hex nuts to the correct torque while maintaining the level
of the rack.
8 Repeat steps 1 though 7 for SBR2 and SBR3.
9 Complete the appropriate boxes in the Indoor BTS Installation
Record.
Go on to level the rack as described in the section "Leveling the
rack".