User's Manual

Table Of Contents
Samsung CDMA BSS: Indoor BTS Installation Manual
53
BSS Version 4, Document V4D0001 release 0.5, Indoor BTS Installation
Manual, release 2.0
Final power up procedure
To prepare the Indoor BTS for commissioning, repower all the racks
using the procedures described in the section "Power-up the rack"
earlier in this chapter. After all racks are powered, complete the
appropriate boxes on the Indoor BTS Installation Record.
The Installation Manager must sign-off on the installation at this
point.
Then continue with the next chapter, "Completion".