Anchor brackets installed,
and rack anchored.
Cable pipe installed.
SBER2 Rack placed at installation
position.
Anchor brackets installed,
and rack anchored.
Cable pipe installed.
Isolation test the racks
SBBR Rack isolated from ground.
SBER1 Rack isolated from ground.
SBER2 Rack isolated from ground.
Leveling the racks
SBBR Rack level and secured.
SBER1 Rack level and secured.
SBER2 Rack level and secured.
Installing the ducts
Arrestor duct installed.
Protection duct 1 installed.
Protection duct 2 installed.
Grounding the racks
SBBR rack ground Ground wire installed and
connected to MGB.
SBER1 rack
ground
Ground wire installed and
connected to MGB.
SBER2 rack
ground
Ground wire installed and
connected to MGB.
Connecting SBBR external cables
Unseat modules All modules unseated
DC power cable Cable installed and
connected
DC power check DC input voltage correct
T1 cable Cable installed and labeled.
GPS cable Cable installed and labeled.
Customer alarm
cable
Cable installed and labeled.
BBU alarm cable Cable installed and labeled.
RF cables Cable installed and labeled
Connecting SBER1 external cables
Unseat modules All modules unseated
DC power cable Cable installed and
connected
Task Description Date Initials Comments