User Manual
Table Of Contents
- Introduction
- Physical Installation
- Cabling
- Initial Testing
- Completion
- Appendix A: Indoor BTS installation required tools
- Appendix B: Indoor BTS installation materials
- Appendix C: Indoor BTS Installation Record
- About this Document
Samsung CDMA BSS: Indoor BTS Installation Manual
15
BSS Version 4, Document V4D0001 release 0.5, Indoor BTS Installation
Manual, release 2.0
4 Install the insulating bushing, washer, and hex nut set for each rack
as shown in the following figure:
5 Insert and tighten an anchor bolt into each of the anchors.
6 Hand tighten the nuts until leveling and isolation testing is complete.
7 Complete the appropriate boxes in the Indoor BTS Installation
Record.