User Manual
Table Of Contents
- Introduction
- Physical Installation
- Cabling
- Initial Testing
- Completion
- Appendix A: Indoor BTS installation required tools
- Appendix B: Indoor BTS installation materials
- Appendix C: Indoor BTS Installation Record
- About this Document
Samsung CDMA BSS: Indoor BTS Installation Manual
32
BSS Version 4, Document V4D0001 release 0.5, Indoor BTS Installation
Manual, release 2.0
3 To unseat a module, pry the ejector handles outward to release the
module:
4 Apply pressure evenly to the ejectors and pull the module out until
you can feel it unplug from the connector.
5 Leave the module on the shelf, disengaged from the connector.
Note: Leave the unseated modules on the shelves, partially out of
the rack. Make sure the unseated modules are not contacting the
backplane in the rack before performing the power-up procedure.
6 Initial and date the appropriate box on the Indoor BTS Installation
Record.