2.7 Installing Feeder Installation
The order of installing the feeder is as follows:
1) Feeder path search
2) Feeder cutting
3) Feeder installation
4) Feeder connection
5) Fixing GPS antenna
6) Feeder connection check
7) Identification tag attachment
2.7.1 Searching Feeder Path
The method of searching the feeder path is as follows:
y Search the feeder installation path from the antenna of the iron tower to the equipment
transceiver.
y Select the path where the length of the feeder can be minimized.
y Installing the feeder should not be hindered, and the place where the feeder is not
damaged should be selected.
2.7.2 Cutting Feeder
The feeder cutting produces the exactly needed length through the path search, and cuts by
using the iron saw for cutting the feeder or instrument.
Take cautions about the followings when cutting the feeder.
y Cut the feeder into the fixed exact length.
y Mark the cutting edge clearly, and cut the feeder. All cutting edges should be cut at a
right angle into the fixed length.
y Cut carefully so that other alien substances such as moist, iron, lead pieces should not
be in.
y When the feeder is cut, the knife or the rasp is used.
y Clean the cutting edge of the feeder by using the solvent.
y Clean the corner of the feeder by using the brush.