User Manual

CDMA2000 BTS SCBS-519L10 Installation Manual/Ed.01
© SAMSUNG Electronics Co., Ltd. 2-95
2.9.1.2 Installing Distributing Switch
The distributing switch should be installed at the height of 1800 mm, which is the same as
that of the existing distributing switch. When the distribution switch is laid, the stainless
duct is used for the upper part of the distributing switch for the neat installation.
The vertical section of all flexible tubes should be completed with the connector.
The power should be laid for each phase according to the cable colors below:
y R-red
y S-white
y T-blue
y N-black