User Manual

CDMA2000 BTS SCBS-519L10 Installation Manual/Ed.01
© SAMSUNG Electronics Co., Ltd. XIII
Figure 2.72 UDA Cable Connection ..................................................................................... 2-33
Figure 2.73 Rectifier Alarm Cable Connection Diagram ....................................................... 2-33
LIST OF TABLES
Table 1.1 Cause and Voltage of Static Electricity.................................................................. 1-12
Table 1.2 Damage Voltage due to Static Electricity .............................................................. 1-12
Table 2.1 TGB Location and Method of Connecting to Iron Tower Grounding Cable ........... 2-33
Table 2.2 Connecting Tower Ring Grounding Cable............................................................. 2-33
Table 2.3 Number of Antennas According to the Antenna Types.......................................... 2-33
Table 2.4 Antenna Lag-Distance .......................................................................................... 2-33
Table 2.5 Feeder Connection Port for Each System............................................................. 2-33
Table 2.6 Feeder Identification Tag....................................................................................... 2-33
Table 2.7 Considerations According to Iron Tower Location ................................................. 2-33
Table 2.8 Concrete Curing Period ........................................................................................ 2-33