CHAPTER 2. Installation
2-26 © SAMSUNG Electronics Co., Ltd.
Storing Racks
Racks should be kept in more secure place at regular intervals so that no falling
occurs.
Vibration Standard
When the system is moved, fasten the system firmly not to exceed the proper vibration
level from 1 to 500 Hz.
Follow the instructions below when installing equipment:
y System racks must be installed on a concrete floor in a location where external access
is limited.
y Circuit packs and modules shall be installed on the system rack accurately.
y Since the rack is not equipped with a protective device against DC integrated devices,
installation of a rectifier should be considered to protect against 190 A for A/B path
and against 139 A for C path.
2.4.1.3 Unpacking Equipment
Procedure for unpacking the equipment is as follows:
1) Unpack the equipment until the equipment is carried to the installation place.
2) Classify and store the equipment according to the job specification. Thus, the
equipment should not interrupt the job.
3) Install the equipment just after being unpacked. If the equipment cannot be installed
promptly, keep the equipment in the corresponding place temporarily.
Moisture
Since equipment can be corroded by moisture, maintain the equipment in dry
condition.
4) Remove just the outer cover without unpacking the equipment.
5) Arrange and unpack the equipment in the target place.
6) Stack other materials in a specific place and return them to the operation department.
Dust
Dust may interrupt the operation of an adjacent system during job in a building.