User Manual

CDMA2000 BTS SCBS-519L10 Installation Manual/Ed.01
© SAMSUNG Electronics Co., Ltd. 2-67
Tower Grounding
1) Install Tower Ground Bar(TGB) at the end of the cable rack at the bottom of the tower.
2) Install TGB in a multipoint method starting from the lightning rod ground wire of GV
38
mm
2
x1C.
3) Fix the ground kit, which is the feeder line ground assembly, on the TGB grounding
terminal and tower hole using the pressure terminal attached to the end of the ground
wire for the ground kit.
Figure 2.52 Connecting Ground Wire on Tower
Lightning Rod
7/8” Feeder Line
Ground Kit
TGB
GV 38mm
2
x 1C
GV 100 mm
2
x 1C