Product specifications

Samsung Electronics
3-5
3-2-2 Installation diagram of indoor unit and outdoor unit
A Indoor unit gas leak test check point
Tape vinyl
Piping
Indoor unit
B Drain hose installation
Cut the piping hole
sloped slightly
Piping (Liquid) 1/4” Clamper tube
Piping (Gas) 1/2”, 3/8” Installation plate
Installation tube Pipe-connection
Vinyl tape Screw
Putty Drain hose
Piping may be laid to the rear, left,
right or down .
Right
Rear
Down
Rear
Left
3
1
1
2
3
4
5
6
7
8
9
10
2
Remote controlRemote control holder
Operating Instructions and Installation
A-UNIT
B-UNIT
Outdoor unit check point
10