Specifications
38
JOHNSON CONTROLS
Form 201.28-NM1.EN.PED/CE (0211)
TECHNICAL DATA
DURULENE ISOLATOR INSTALLATION
D
D
TOP BOLT
C
L
SECTION D-D
TOP WASHER
("A")
("B")
C
L
("C")
("B")
1. Read the following instructions before beginning instal-
lation.
2. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal drawings
or as otherwise reccomended.
3. Set isolators on fl oor, housekeeping pad or subbase,
ensuring that all isolators centrelines match the equip-
ment mounting holes. The VMC group reccomends that
the isolator base (“A”) be installed on a level surface.
Shim or grout as required, leveling all isolatorbases to
the same elevation (0.03125-inch maximum difference
can be tolerated).
4. Bolt or anchor all isolators to supporting structure utilis-
ing base thru holes (“B”).
5. Remove top bolt and top washer. Place equipment on
top of isolators so that mounting holes in equipment or
base line up with threaded hole (“C”).
6. Reinstall top bolt and washer and tighten down.