Specifications

40
JOHNSON CONTROLS
Form 201.28-NM1.EN.PED/CE (0211)
TECHNICAL DATA
25 MM ISOLATOR INSTALLATION
UPPER
HOUSING
(D)
LOWER
HOUSING
NON-SKID
ELASTOMERIC
PA D
POSITIONING
PIN (H)
0.25” min - 0.5” max
(C)
(C)
(B)
EQUIPMENT
BASE
1. Read the following instructions before beginning instal-
lation.
2. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal drawings
or as otherwise reccomended.
3. Set isolators on oor, housekeeping pad or subbase,
ensuring that all isolators centrelines match the equip-
ment mounting holes. The VMC group reccomends that
the isolator base (“B”) be installed on a level surface.
Shim or grout as required, leveling all isolatorbases to
the same elevation (0.25-inch maximum difference can
be tolerated).
4. Bolt or anchor all isolators to supporting structure utilis-
ing base slotted holes (“C”).
5. Place equipment on top of isolators making sure that
mounting holes of the equipment line up with isolator
positioning pin (“H”).
6. The adjustment process can only begin after the equip-
ment or machine is at its full operating weight.
7. Adjust each isolator in sequence by turning spring
adjusting bolt (“D”) one full counterclockwise turn at
a time. Repeat this procedure on all isolators, one at a
time.
8. Continue adjusting each isolator until a minimum of
0.25” clearance is achieved between the lower housing
and upper housing. (See illustartion above).
9. Fine adjust isolators to level equipment.