User manual
75
5
Test Run and Troubleshooting
Test Run Precautions
Before installing the I/O wiring of the PLC and supplying power, check
the following items.
Item What to check
The connection of
the power cable
and the
I/O cables
• Check if the wiring is secured.
• Check if the terminal screws are tightened.
• Check if the parts of connectors are properly joined.
• Check if the I/O modules are firmly fixed.
• Check if the power cable is securely connected.
• Check if the cable size is correct.
Grounding
• Check if the grounding is triple grounded and
separate from other device grounds.
Battery
• Check if the battery is installed into holder on the CPU
module.
• Check if the battery connector is connected to the
CPU board
Emergency
stop circuit
• Check if the emergency stop circuit for problems
external to the PLC is wired accurately, and will
immediately disconnect power on demand.
Power source
• Check if the power and voltage sources are within
specifications.
- For 110V ac (90 to 132V ac)
- For 220V ac (180 to 264V ac)
• Check if the power to the AC input module is within
specifications.