Installation Guide

English 51
Operations
Provision for Open Access to the Connected Product Requirements
1. SGIP Open Standards (Smart Energy Pro๎€Ÿle 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2. Samsung OPEN API
- Operational Status, User Settings & Messages
- ICE Maker Status: GET /devices/0/fridge/iceMaker
- Door Open Alarm: GET /devices/0/Door/openState
- DR Status: GET /devices/0/drlc
- Delay Defrost Capability
- Set Schedule of the Defrost Delay: POST /devices/0/fridge/defrostreservations
- Get Schedule of the Defrost Delay : GET /devices/0/fridge/defrostreservations
- Delete Schedule of the Defrost Delay: DELETE /devices/0/fridge/
defrostreservations/<<id>>
- Defrost Delay On/OFF: PUT /devices/0/fridge
Untitled-7 51 2017-01-20 ๎€Ÿ๎€Ÿ 2:23:17