User manual

SAMSUNG Computer WF10
Example of a drive sequence setup
Sequence 1 2 3
Cable type Primary Hard Drive cable Secondary Hard Drive cable
Jumper setup Master Slave Master
Current status Hard Drive CD Drive
Drive text (C:\ ) (D:\ )
With 1 additional Drive Hard Drive Added Hard Drive CD Drive
text Hard Drive (C:\ ) (E:\ ) (D:\ )
Hard Drive over 60GB may be divided into 2 different partition drives
(C:\ and D:\). In such as the case, the next drive text will fall into the next
alphabet sequence (e.g. E, F).
Signal cable guide
You may be equipped with an 80PIN or 40PIN signal ribbon cable.
The 80PIN cable is a yellow cable that is used as the Primary Hard Drive cable
and has preassigned Master and Slave positions.
The 40PIN cable assigns drive sequence according to the drive’s jumper rather
than the cable itself (cable select).
Example) 80PIN cable
WW
WW
aa
aa
rr
rr
nn
nn
ii
ii
nn
nn
gg
gg
SYSTEM (Blue)
Connects to the Primary Hard Drive
connector on the Motherboard
SLAVE (Grey)
Connects to the
Slave drive
MASTER (Black)
Connects to the
Master drive
68
SAMSUNG Computer WF10
computer WF10-4 3/7/02 5:12 PM Page 16