5T-Barn Door Installation Instruction 5T-Barn Door Assembly Detail A1 Side Stile 1 A2 Side Stile 1 T1 Top Rail 1 T2 Middle Rail 2 T1 C Tempered glass T2 C Tempered glass A1 T3 Middle Rail A2 T3 2 C T4 Bottom Rail Tempered glass 1 T3 C Tempered glass 5 D 3.93”Carriage Bolts 12 E Plastic CAP C Tempered glass T2 C 12 Tempered glass T4 F Wood Plug 8 G Hex Key 1 E D D E D F TIPS:Contact and Ask us anything! Email us at :sandinginc@gmail.
Stile Side Views T1 Top rall T2 Middle rall T3 Middle rall T4 Bottom rall Instructions Step-1 Place the Left Side Stile (A1) on a smooth and clean surface with the groove facing to the right. Get Top Rail (T1), Middle Rail (T3), and Bottom Rail (T4), insert their tongues into the grooves of (A1), and align the pre-drilled holes of (A1) and pre-installed anchors of (T1/T3/T4). Get 3.
Step-2 Get Middle Rail (T2), insert Wood Plug (F) into the 4 pre-drilled holes on each T2, and then insert the left end into the inside pre-drilled hole on (A1). The pre-drilled holes' location is as indicated in the instruction. T1 T2 A1 F T3 T2 A1 T3 T2 T4 Step-3 Get Tempered glass (C), slide it along the grooves between T, and make sure to insert it into the groove of (A1). Please wear gloves to prevent cuts on your hands or the glass is too slippery to install.
Step-4 Get Right Side Stile (A2), make the groove side cover the rail tongues and the edge of the slat then get 3.93” Carriage Bolts (D), insert to the holes on the outside of A2, and use Hey Key (G) to fasten bolts (D) to the pre-installed anchors in (T1/T3/T4).
Barn Door hardware installation Product Content 1.1, Rail 4.1, 2 x Door Stopper 2.1, 2 x Hanger 4.2, T-Shape Floor Guide 4.3, Roller Floor Guide 2.2, 4 x Door Screw 4.4, 2 x Rubber End 3.1, Wall Spacer 3.2, Anchor (For concrete wall) 5.1, 1 x Handle Pull and Flush 3.3, Lag Bolt (For wood stud) Tools Needed 1, Pencil 5, Level 2, Wrench 6, Drill 3, Phillips Screwdriver 7, Drill Bit 4, Plumb Bob Ø3/8” Ø7/32” 8, Tape Measure NOTICE Please retain these instructions for future reference.
Number of Parts in Different Track Sizes Door Size (inch) Track Sizes M10x55mm Screw Ø10mm Anchor Wall Spacer M8x100mm Screw Rail Connector 14 4FT 4 3 3 3 1 — 16 4FT 4 3 3 3 1 18 4FT 4 3 3 3 1 20 4FT 4 3 3 3 1 21 4FT 4 3 3 3 1 22 4FT 4 3 3 3 1 24 4FT 4 3 3 3 1 26 5FT 4 4 4 4 1 28 5FT 4 4 4 4 1 30 5FT 4 4 4 4 1 32 6FT 4 5 5 5 1 34 6FT 4 5 5 5 1 36 6.6FT 4 5 5 5 1 38 6.
Measurements ceiling A G 16” 16” 16” 16” B C 1/” H E 1/” 3/” H+1/” F D ⁄” A Overall Rail length is 4ft/5ft/6ft/6.6ft/7ft/8ft/9ft/10ft. B The gap between each pre-drilled hole is 16”. C Distance from door top side to holes on the wall is 1/”.. D Distance from the bottom of the door to the floor is 3/8”. E Door height is H. F The height of holes on the wall is H+1/”. G Minimum distance from the rail hole to the ceiling is 6"(J shape).
Step-1 Place the rail against the wall, and use a pencil to mark where the holes should be. Make sure the height of holes on the wall is H+1/”. Level can make the rail horizontal. Please choose the installation method for the track based on the type of your track accessories. One-Piece Track Connector connection method Wedge embedded connection method Step-2 We provide 2 kinds of screws for you to install rail onto concrete wall or drywall. B Drywall Installation. A Concrete wall Installation.
Step-3 Insert door stoppers into rail. Install door stoppers between A-B and C-D Door stopper is used to prevent the hangers coming out of the rail. A B C D Do not screw it in place at this stage Step-4 Install the hangers onto the door according to the measurement in the pictures below. Maximum door thickness is 1/”.. If your door’s thickness is less than 1/”, please add some bolt washers or cut the long door bolts to a suitable length to fit the door.
Step-6 Hang the door over the rail. Step-7 Turn the rubber ends approximately 180 degrees so that they are stuck between the door and the rail.
Step-8 Adjust the 2 door stoppers to find a suitable position, Use the hex key to screw the door stoppers in place. Step-9 Install the barn door Handle Pull and Flush Hardware Set. Put barn door handle on the door first to fix a suitable position and make a mark, Use suitable drill bit to drill holes on the door where the mark is, and then install the barn door Handle Pull and Flush Hardware Set according to the picture.
Step-10 We provide 2 types of floor guide for you. Floor guide is used to keep your door stable and prevent the door bottom swinging back and forth when you slide it open and closed. 15/9” 15/9” a. T-shape floor guide (installed on the floor) use router or circular saw to create a kerf at bottom of the door, along the center to allow the tip of the T-shape floor guide to fit in between. b. Roller floor guide (installed on to the wall), customize the distance according to the door thickness.