User manual

INSTALLATION AND
PROGRAMMING INSTRUCTIONS
SUNWAY M XS 3000TL
35/124
NOTE
1. Grid voltage: 230 Vac +/-15 %.
2. Grid frequency: 50 Hz +/-0.3 Hz.
3. PV field voltage ranging from 150 V to 540 V.
CAUTION
GRID INTERFACE CONFIGURATION The grid interface configuration
based on the Country where the inverter is installed may be changed only
within the first 12 hours after the commissioning of the inverter.
Once started, the SUNWAY M XS operates in full automatic mode. The inverter operating conditions may be
constantly monitored via the touchscreen display (see section 4). If not used for 5 minutes, the touchscreen
display automatically turns off to minimize self-consumption. Press anywhere on the display to turn it on
again.
If solar radiation is absent, the equipment turns off after the time set in parameter P041 (factory setting: 15
minutes). When solar radiation is present, the SUNWAY M XS automatically restarts and resumes the
production of electric power. The inverter may be restarted at any time by pressing the WAKE UP button
from the graphic interface module. When the inverter is on, you can edit the operating parameters and
display production data and fault list, even if no PV field voltage is supplied.
3.5.1. Stopping the Inverter
Press STOP from the touchscreen display to stop delivering energy to the grid and to stop the inverter.
DANGER
parts are dangerous even if the inverter has been stopped.
DANGER
conditions, after cutting
power supply.
DANGER
on the connections to give the DC-link capacitors time to discharge.