Power Supply User Manual

18
8. Preparations Before Operation
Check the following items before starting operation:
Visually inspect the UPS to verify that there is no visible damage.
Check that the UPS is connected to a utility power source that meets the input
specifications.
Check that the input switch MAIN SW is set to “OFF”.
Check that load devices are connected correctly.
Check that none of the connections is loose.
BATT
EXT.
MAIN SW
,
Check input
power source
,
Check load
connections.
Switch is “OFF”.