Flag Mount Installation
20) Place the housing frame onto the housing. You
should hear a snapping noise as the latches drop
into place.
19) Place the filter over the display board. You
should hear a snapping noise as the latches drop
into place.
21) Hang the base of the pole on the mounting plate so that the lip is on top of the base, and the holes
for the screws are on the bottom of the base. Attach the wires from the pole to the wires in the gang box,
then use the two black base screws to attach the other side of the base to the mounting plate.
22) Power the clock. After testing the LED segments and presenting some diagnostic information, the
clock will display the time based off if its internal quartz oscillator. It will correct itself to show synchronized
time as soon as it receives data from a master clock.
WALL