Installation Manual

18
20
21
19
27
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation
19) Place a housing frame onto each housing. You
should hear a snapping noise as the latches drop
into place.
18) Place a filter over each display board. You
should hear a snapping noise as the latches drop
into place.
20) Hang the base of the pole on the mounting plate so that the lip is on top of the base, and the holes
for the screws are on the bottom of the base. Attach the wires from the pole to the wires in the gang box,
then use the two black base screws to attach the other side of the base to the mounting plate.
WALL
CEILING
21) Power the clock. After testing the LED segments and presenting some diagnostic information, the clock
will display the time based off if its internal quartz oscillator. It will correct itself to show synchronized time
as soon as it receives data from a master clock.