Owner manual
Install 7U94/7U94-2
4
Install 7U93
Through-bolt
Screws (2)
# 8 - 32 x 2-1/8"
Cup
Washers
(2)
Self-tapping
screws (2)
# 6 x 3/4"
Scalp- twist
to secure
on to rose
Scalp- twist
to secure
on to rose
Determine correct backset and
door thickness - then place template
on door and mark for holes.
High edge
of beveled
door
Bore 2-1/8"
hole thru
door
Cut out to fit
lock front, as
shown
Bore 1" hole
thru into first
hole (this
hole must be
centered in
door edge and
must be parallel
to sides).
38" from floor
recommended height
Swivel front
latch std. for
flat and
beveled doors
Centerline for strike screws
and front screws
To prep door for lock
To mortise frame for strike
Cut out jamb for
strike
Stop
Lock
Strike
Guardbolt stops on strike
when door is closed.
See reverse side
When strike box is not
used, recess in jamb
must be deep enough
to allow latchbolt to
extend its full
free length.
Locate strike screws at
1/2 the door thickness
measured from stop.
5/32
(4mm)
1-1/8
(29mm)
2-1/4
(57mm)
1
2
3
4
Note - Consult factory
for correct template
information for 38-2, 93,
94, and 94-2 functions
2-1/4" (57mm)
2" (51mm)
1-3/4" (44mm)
1-3/8" (35mm)
Fold here on
high edge of
beveled door
Drill 1" (25mm)
hole at center of
door thickness
5/32" Dia. (15mm)
A6305F
IMPORTANT
SEE BACK FOR DIRECTIONS
BACKSET
Standard
6 line
Standard
7, 8 & 9
line
2-3/8" Backset
(60mm) Nominal
2-3/4" Backset
(70mm) Nominal
3-3/4" Backset
(95mm) Nominal
2-1/8" Dia.
5" Backset
(127mm) Nominal
®
A7240D
Copyright
©
2013, Sargent Manufacturing Company, an ASSA ABLOY Group
company. All rights reserved. Reproduction in whole or in part without the
express written permission of Sargent Manufacturing Company is prohibited.
6305 Template