SAFETY INFORMATION caution Please carefully read the following Important safety Information before: handling or Installing this shower door. Hers is a risk of serious injury while handing this product. To minimize these risks, please note: Always wear safety glasses and gloves whi handing. Always follow the installation instructions. Inspect glass for damage before installation.
WARM RIFE vet en sss 1s wooed hope. FELON NOTE:Our shower door Is affixed with explosion-proof film. stall the side with th: pols! proof film prompt Inside the shower room. Step: Measure the levelness of the threshold and the perpendicularity of the wall. Measure the bathroom floor threshold and side wall vertical before installing a glass shower door. Ensure the threshold is flat and side walls are perpendicular using a level. Make adjustments for smooth door operation.
Preinstalled two & hinge on the glass door according to the illustration. Steeplechase prepare two thick wooden boards by yourself and and place them under the sliding door. Ste pd: Mark the holes on the wall. Move the @ sliding door close to the wall and ensure it adheres to the wall. Use a level to measure and ensure the door is perpendicular to the ground. Mark the drilling positions on the wall with a pen. NOTE: The wide sleek screen printing on the glass door should face upwards.
Step: Install the sliding door onto the wall. 28x40mm Step: Mark the holes on another wall. @x1 Insert @ side Jamb Intel fixed door, align with @ gliding door. Adjust vertical using a level and mark position . ‘Separate @ sides Jamb from ® fixed door, return to original position, and mark drilling positions. Carefully remove the glass door temporarily and drill holes at the marked positions on the wall. Insert 8 pieces of ® plastic expand plug Into the holes respectively.
Preinstalled the fixed door onto the wall. 1] @6xa0mm Drilling holes at the marked positions on the wall. Insert 3 places of @ plastic expand plug Into each hole. Put @side jamb back in place, then screw in 3 pieces of @self-tapping screws. Insert the © fixed door. Steps: Install the waterproof strip. eID Align the ® waterproof strip with @ sliding door. Draw cutting lines based on hinge position, cut out three sections, insert onto @sliding door.
Preinstalled the water blocking piece. Take out the @water blocking plastic piece LR, the ® water blocking strip and ® water blocking plastic piece, then combine them as shown in the illustration. Steppe: Fix the water blocking strip on position. Place ® water blocking strip threshold, align with ® @x1 | fixed door. ha Mark drilling positions. ox) Drill hole, insert screw @© into® expand plug. Sept: Install the magnetic profile.
Steppe: Install the water blocking piece. Insert @ lower water blocking strip into @ sliding door bottom as par drawings. Orientation matters, correct insertion ensures proper door closure. Inside Steppe: Adjust the opening width. Product has adjustable width. Check for gaps between magnetic profile seal when sliding door closed as per drawings. Ad Just fixed door width to eliminate gaps.
Steppe: Apply silicons to the water blocking strip. Apply silicons sealant along the @ water blocking strip as shown in the illustration. The Installation process Is now complete. 3 Steppe: Secure the fixed door. 1 @0.13in 020mm Ta Ten J ®@x3 10 v INN 0 VN JN After adjusting the width of the fixed door, drill 3 holes at the overlapping area of the @ side jamb and the ® fixed door. You can decide the Interval between the holes. Screw In 3 @self-tapping screws Into the 3 screw holes respectively.
SHOWER DOOR MAINTENANCE MANUAL Cleaning: 1.When cleaning the farm, glass and hardware accessories of the shower door, please use a soft cloth. If thees is slight dirt, please use a soft cloth or sponge dipped in "neutral detergent® for cleaning. After removing the stubborn dit, please rinse with platy of water to prevent the cleaning agent from remaining on the surface of the shows door and causing corrosion damage.