HIGH RISE™ Portable Restroom Assembly Instructions 2530 Xenium Lane North, Minneapolis, MN 55441 Telephone: 763-553-1900 / Fax: 763-553-1905 800-328-3332/ www.satelliteindustries.
INTRODUCTION These Assembly Instructions cover the High Rise portable restroom. Satellite portable restrooms must be assembled according to approved assembly procedures. Avoid variations in assembly which could adversely affect product life. • The assembly procedures are written for assembly of single units. If assembling multiple units, considerable efficiency can be gained by having a crew working in assembly line fashion. TOOLS 1. DRILL ELEC/CORDLESS 3. 7/16” (.435)[11mm] OPEN END WRENCH 5.
PARTS LIST PN 20930 REV A Page 2
PN 20930 REV A Page 3
PN 20930 REV A Page 4
DIRECTIONS 1. ATTACH FLOOR SUPPORT BRACKETS AND CASTER. ATTACH #17 SUPPORTS: TO #11 FLOOR WITH #38 RIVETS ON TOP OF FLOOR AND #48 WASHERS ON BOTTOM OF SUPPORT. AS SHOWN BELOW. NOTE: MAY NEED TO CLAMP SUPPORTS TO FLOOR PRIOR TO RIVETING. ATTACH #8 CASTERS: TO FRONT HOLES OF FLOOR USING #21 BOLTS, #49 WASHERS AND #35 NUTS. PLACE #36 PLATES IN BETWEEN FLOOR AND CASTER. AS SHOWN BELOW. ATTACH #9 CASTERS: REPEAT SAME PROCESS AS #8 CASTERS FASTENING. BUT USE BACK HOLES IN FLOOR.
3. ATTACH PANELS TO ANGLES. FASTEN #15 LEFT PANEL FIRST TO THE LEFT SIDE OF UNIT. PANEL ON THE INSIDE OF ANGLES SO THE TEXTURE SIDE IS SHOWING ON THE OUTSIDE OF THE TOILET. NOTE: THE 4 HOLES FOR MOUNTING URINAL (ONLY LEFT PANEL HAS PRE-DRILLED HOLES FOR MOUNTING URINAL) ARE TOWARDS THE FRONT OF THE UNIT. FASTEN WITH #37 RIVETS AND #48 WASHERS AS SHOWN. RIVET EACH CORNER FIRST. THEN FINISH RIVETING REMAINING HOLES IN PANEL TO ANGLES AND FLOOR. REPEAT THIS STEP ON BACK AND RIGHT SIDE PANELS.
6. FASTEN CORNER GUSSETS. FASTEN #28 GUSSETS UNDER REAR CORNER ANGLES. FASTEN WITH #38 RIVETS AND #48 WASHERS AS SHOWN. REPEAT ON OPPOSITE CORNER. 7. TIGHTEN ALL BOLTS AND NUTS IN ANGLES TO FLOOR USING THE 7/16” SOCKET AND WRENCH. 8. INSTALL TANK AND TOILET SEAT IN REAR OF TOILET. SLIDE #18 TANK INTO BACK OF TOILET. FASTEN #16 TOILET SEAT TO TANK. TRANSFER DRILL THROUGH HOLES IN PANELS (2 PER PANEL) THROUGH #18 TANK. FASTEN PANELS TO TANK WITH #41 RIVETS AND #48 WASHERS.
. TIGHTEN ALL REMAINING BOLTS AND NUTS TO THE TOP ANGLES AT THIS TIME WITH 7/16” SOCKET AND WRENCH. 10. INSTALL BRACE DOOR FRAME RIVET BOTTOM OF #7 BRACE TO TOP OF FLOOR, SEE FLOOR VIEW FOR HOLE LOCATION. USING #38 RIVETS AND #48 WASHERS. AS SHOWN. RIVET TOP OF #7 BRACE TO LEFT SIDE PANEL. USING #39 RIVETS AND #48 WASHERS. AS SHOWN. 11. INSTALL URINAL. PRESS #32 HOSE ONTO #19 URINAL AND FASTEN WITH #25 CLAMP. PLACE HOSE END INTO URINAL HOLE IN WASTE TANK.
PLACE #44 SPACER ON INSIDE OF #5 VERTICAL HASP ANGLE. FASTEN WITH #37 RIVET FROM THE OUTSIDE. RIVET THE #31 HASP TO ANGLE WITH #38 RIVETS (THROUGH HASP THEN ANGLE) AND #48 WASHERS (ON INSIDE OF TOILET) AS SHOWN. 13. FASTEN DOOR ASSY TO ANGLE. RIVET THE #10 DOOR ASSY TO ANGLE USING #38 RIVET (THROUGH HINGE THEN ANGLE) AND #48 WASHER (ON INSIDE OF TOILET) AS SHOWN. REPEAT ON REMAINING HINGES. 14. FASTEN SPACER AND CABLE ANCHOR TO ANGLE.
PLACE THE #43 SPACER UNDER THE CABLE ANCHOR BRACKET. INSERT (2) #40 RIVET THROUGH BOTH HOLES IN BRACKET AND THROUGH SPACER. ATTACH TO HOLES IN ANGLE BELOW TOP HINGE WITH #48 WASHERS ON OUTSIDE OF ANGLE. NOTE: NEED TO HOLD DOOR PART WAY OPEN TO PLACE WASHERS ON RIVETS. FASTEN SPRING ANCHOR TO DOOR WITH #37 RIVETS. NOTE: NEED TO PULL BRACKET INTO POSITION ON DOOR AND INSERT RIVETS THROUGH BRACKET INTO HOLES IN DOOR. 15. INSTALLATION OF THE 2 ROLL AND 3 ROLL PAPERGUARDS.
LOCATE PAPERGUARD ON LEFT PANEL AS SHOWN. MARK THE (4) HOLES ON THE INSIDE OF THE PAPERGUARD WITH MARKER. DRILL OUT THE (4) MARKED SPOTS ON PANEL WITH A 1/4” DRILL BIT. FASTEN PAPERGUARD HOOD WITH THE #11054 RIVETS FROM THE OUTSIDE AND #11315 WASHERS ON THE INSIDE OF TOILET. SLIDE #16844 SPINDLE IN PAPERGUARD. 3 ROLL PAPERGUARD LOCATE PAPERGUARD ON LEFT PANEL AS SHOWN. USING THE (2) HOLE ON BOTH ENDS OF THE PAPERGUARD DRILL THROUGH PAPERGUARD AND PANEL WITH A 1/4” DRILL BIT.