Specifications

Operation Manual
Operation ManualOperation Manual
Operation Manual 4. Media Loading
4. Media Loading4. Media Loading
4. Media Loading
CL408
CL408CL408
CL408e
ee
e/412
/412/412
/412e
ee
e 39
39 39
39
5. Feed the leader portion of the ribbon through the print head
assembly and up to the ribbon rewind spindle and tape it to the
ribbon core. Manually turn the rewind spindle to wrap the ribbon
onto the core making one to two turns to secure it.
6. Make sure the ribbon path matches the one shown in the dia-
gram.