Installation manual
18
5.1.3 Water treatment
In the case of an existing installation, it is
Essential that prior to installing the new
boiler the system is thoroughly flushed.
For optimum performance after
installation of a new system, the boiler and
its associated central heating system
should also be flushed.
Flushing should be carried out in
accordance with BS7593: 1992 using a
cleanser such as Sentinel X300 or X400,
Fernox Superfloc or Salamander corrosion
guard cleaner.
For long-term corrosion protection, after
flushing, an inhibitor suitable for stainless
steel heat exchangers should be used,
refer to the current issue of BS 5449 and
BS 7593 on the use of inhibitors in central
heating systems. Examples are Sentinel
X100 Fernox or Salamander corrosion
guard inhibitor.
5.2 Thema CONDENS dimensions
370
410
742
215
5.3 Thema CONDENS SB dimensions
370
410
742
215
5.4 List of delivered equipment
The boiler is delivered in one package:
One documentation pack:
- 1 user and installation manual
- 1 guarantee envelope
- 1 Wiring diagram
- 1 gas conversion label
One parts pack:
- 1 drain tube
- 2 filling loop extensions (*)
- 1 connection pack + wall template
- 1 gasket+ flow limiter pack
- 1 valve pack
(*) Not required for SB models
The flue is supplied separatly and will
depend upon the configuration of the
installation.
5.5 Fixing to the wall
Make sure the material you use fits
those of the appliance.
-
-
•