Technical data

24
4000121771-2
12 Horizontal Top Flue Installation
12a.1 The
Horizontal Top flue
- kit 86285
Suitable for installations that require a max. flue length "L" of
740mm.
If a shorter flue length is required, the flue can be cut to a min.
length"L" of 260mm rear or 300mm side. See diagram 12a.2 for
min. flue lengths.
12a.2 Flue systems rear and side, refer to
diagram 12a.1.
12a.3 Flue cutting, refer to diagram 12a.3.
Important: Do not leave any burrs or sharp edges on the cut
ends of the pipes.
11886
Diagram 12a.2
70mm
65mm
410 mm
205mm
20mm
Min. Clearance
70mm
184mm
65mm
SIDE FLUE
REAR FLUE
L
L
Note :
Top of boiler
casing not
front panel
Note :
Top of boiler
casing not
front panel
* refer to diagram 6.1
11646
B
C
J
I
H
F
G
A
D
The flue kit 86285 is 810 mm long and comprises:
- Air duct pipe .......................................................... A
- Flue duct pipe ........................................................B
- Elbow....................................................................... C
- Fixing collar seal .................................................... D
- Fixing collar.............................................................. E
- External rubber sealing collar ............................... F
- Internal flange ....................................................... G
- Gasket ..................................................................... H
- Screws ....................................................................... I
- 'O' rings..................................................................... J
Diagram 12a.1
E
Horizontal Top flue kit
450 mm
225 mm