User's Manual

CHAPTER 2
Savi Fixed Reader SR-650 Installation Guide 13
Savi Fixed Reader
SR-650-101 Installation
2
Installing the Savi Fixed Reader SR-650-101 is a four-step process.
First, consult a site plan to determine the readers installation location.
Second, position the reader to enable the most efficient communication
range.
Third, connect power cables and network cables, and supply power.
Finally, verify network communication between the reader and the
computer.
Planning a Site
To plan a site you must conduct a site survey and plan the RFID network
configuration. Once the site plan is in place, refer to it to determine where to
install Savi Readers. Follow the directions in this manual to ensure proper
installation of each Savi Fixed Reader SR-650-101.
Positioning Savi Fixed Readers
Savi Fixed Readers are designed to operate in a wide variety of
environments. They are housed in rugged, weatherproof enclosures. In ideal
conditions (large, open, and unobstructed areas), Savi Readers can collect
tags up to 300 feet (91.44 meters) away.
An area can contain factors that limit the Savi Reader collection range,
including:
Asymmetrical shape to the collection area
Obstructions such as multiple walls, chained areas, solid-core doors, and
enclosures