Use And Care Manual
16
Assembly Instructions
15
16
Assembly on the right platform
1、Install the right side table on the furnace body assembly as shown below and
tighten with M6x12 screws.
B
Hardware Used
M6x12 : x2Screw
Hardware Used
Assembly of the left furnace
1、As shown below, install the left side furnace on the furnace body assembly and
tighten it with M6x12 screws.
2、Tighten the preset screws on the furnace body.
2、Tighten the preset screws on the furnace body.
B
M6x12 : x2Screw
Fig.19
Fig.20
2、将炉体上的预装螺钉拧紧。
1、如下图,将左边炉安装在炉体总成上,并用M6x12螺钉紧固。
15.右边台的装配
2、将炉体上的预装螺钉拧紧。
16.左边炉的装配
1、如下图,将右边台安装在炉体总成上,并用M6x12螺钉紧固。