Use and Care Manual

5
WALL AND COUNTERTOP PROFILES
5. Solidly embed the tiles so that the tiled surface
is flush with the top of the profile; the profile
should not be higher than the tiled surface, but
rather up to approx. 1/32" (1 mm) lower.
5a. If the FINEC profiles, in aluminum, are used
to create a 3 way external corner, into which
the two upper profiles were fitted at an
angle of 45°, cut the adjoining lower profile
to size. The trapezoid-perforated anchor-
ing leg, including the joint spacer, must
be cut off straight to the visible area by a
minimum dimension x, depending on the
profile length; see the AE illustration below.
5b. If the FINEC profiles, in stainless steel, are
used to create a 3 way external corner, into
which the two upper profiles were fitted
at an angle of 45°, cut the adjoining lower
profile to size. In this case, the trapezoid-
perforated anchoring leg must be cut off by
a minimum dimension x, depending on the
profile length, including the visible area has
to be chamfered at a 45° angle; see the E
illustration below.
Note: With FINEC, chamfer tiles adjacent to the
profile by 45°. RONDEC-DB is intended to be
higher than the tiled surface.
6. Set the tile to the integrated joint spacer,
which ensures a uniform joint of 1/16" - 1/8"
(1.5 - 3 mm). With the stainless steel profiles,
DECO-SG, INDEC, and RONDEC-DB,
leave a space of approximately 1/16" - 1/8"
(1.5 - 3 mm).
7. To set tile along the face of RONDEC-CT,
apply thin-set mortar to the back of the tile
using a margin trowel. Press the back-buttered
tiles into the face of the profile, making sure to
force thin-set mortar fully into the dovetailed
grooves. The tiled surface should be flush
with the outer edge of the profile; the profile
should not be higher than the tiled surface,
but rather up to approx. 1/32" (1 mm) lower.
Note: The recessed face accepts tile widths up
to 1-1/8" (29 mm).
8. Fill joints completely with grout or setting
material. Note: Remove the protective foil from
ECK-E immediately after grouting.
9. Work with materials and tools that will not
scratch or damage sensitive surfaces. Setting
materials must be removed immediately,
especially from aluminum.
Note: Matching corners are available for QUADEC,
RONDEC, INDEC, SCHIENE-STEP (stainless steel
version, depending on vertical leg length), RONDEC-
STEP, and RONDEC-CT. Connectors are available
for QUADEC, RONDEC , and SCHIENE-STEP
(stainless steel version).
Corners and end caps are held in place with
thin-set mortar. Fill the ends of the profile with
thin-set mortar prior to inserting the accessories.
Connectors are held in place with a friction fit. Insert
the connector into the profile approximately half
the length of the connector piece and connect the
adjacent profile.
For installation of SCHIENE-STEP corners and
connectors: Install using KERDI-FIX, silicone, or
similar adhesive. Prior to application, any contact-
inhibiting substances (e.g., grease, etc.) must be
removed. The accessories should overlap the
profiles by at least 3/8” (10 mm). The accessories
must be slid on the profiles during profiles installation
(cannot be placed over the profiles after installation).
For installation of RONDEC sink corners
(1-1/2" radius):
1. Insert the sink corner connectors into the
profiles. Apply thin-set mortar to the substrate
and firmly embed the profiles into the mortar.
2. Using a margin trowel, fill the back of the sink
corners with thin-set mortar. Install the corners
over the connectors and align. Setting materials
must be removed immediately.
QUADEC-K/DIADEC-K
1. QUADEC-K may be used to cover assembly
edges up to 1/2" (12.5 mm) thick. DIADEC-K
may be used to cover assembly edges at least
1/4" (6 mm) thick.
2. Fill the profile cavity with thin-set mortar.
3. Using a notched trowel, apply thin-set mortar to
the area where the profile is to be placed.
4. Press the profile into the mortar and align.
Leave a space of approximately 1/16"-1/8"
(1.5 – 3 mm) between the profile and tile.
5. Fill joints completely with grout or setting
material.
6. Work with materials and tools that will not
scratch or damage sensitive surfaces. Setting
materials must be removed immediately.
Note: QUADEC-K may also be adhered using
KERDI-FIX. Matching inside/outside corners and
connectors are available.
Corners/end caps are held in place with thin-set
mortar. Fill the ends of the profile with thin-set mortar
prior to inserting the accessories. Connectors are
held in place with a friction fit. Insert the connector
into the profile approximately half the length of the
connector piece and connect the adjacent profile.
DESIGNBASE-SL
1. DESIGNBASE-SL is applied to prepared walls
using KERDI-FIX or other suitable adhesive.
Prior to applying the adhesive, make sure that
all surfaces are free from adhesion-inhibiting
substances such as oil or grease.
2. Apply beads of adhesive to the back of the
profile and press the profile onto the wall,
ensuring solid contact throughout.
3. Use a suitable cleaning agent to remove any
excess adhesive from around the profile.
Remove the protective foil.
Note: The accessories must be slid on the profiles
during installation (cannot be placed over the profiles
after installation). The optional sealing lip is inserted
into the profile prior to installation.
ECK-K/-KHK/-KI
1. ECK-K/-KHK/-KI are applied to prepared wall
corners using KERDI-FIX, silicone, or a similar
adhesive. Prior to applying the adhesive, make
sure that all surfaces are free from adhesion-
inhibiting substances such as oil or grease.
Apply a bead of adhesive to the back of each
of the profile legs; then press the legs onto the
wall covering, ensuring that the lateral edges lie
flat and have solid contact throughout.
2. Use a suitable cleaning agent to remove any
excess adhesive from around the profile legs.
3. Remove the protective foil.
Install ECK-KHK inside and outside corners using
a permanently elastic, waterproof adhesive (e.g.,
KERDI-FIX or silicone). Prior to application, any
contact-inhibiting substances (e.g., grease, etc.)
must be removed. The connectors should overlap
the profiles by at least 3/8" (10 mm).
QUADEC-FS
1. Set tiles up to the area where QUADEC-FS is to
be installed as a feature strip.
2. Using a notched trowel, apply a sufficient
amount of thin-set mortar to this area and/
or to the back of QUADEC-FS and press
the profile into the mortar and align. Leave
a space of approximately 1/16" – 1/8"
(1.5 – 3 mm) between the profile and the tile.
Note: QUADEC-FS may also be attached to
the substrate with fasteners.
3. Set the adjacent row of tiles. Leave a space
of approximately 1/16" – 1/8" (1.5 – 3 mm)
between the profile and the tile.
4. To set tile along the face of QUADEC-FS, apply
thin-set mortar to the back of the tile using a
margin trowel. Press the back-buttered tiles
into the face of the profile, making sure to force
thin-set mortar fully into the dovetailed grooves.
The tiled surface should be flush with the outer
edge of the profile. Note: The recessed face
accepts tile widths up to 2" (51 mm).
5. Fill joints completely with grout or setting
material.
6. Work with materials and tools that will not
scratch or damage sensitive surfaces. Setting
materials must be removed immediately.
Note: Matching inside corners/outside corners/end
caps are available.
Corners/end caps are held in place with thin-set
mortar. Fill the ends of the profile with thin-set mortar
prior to inserting the accessories.
AE
=X
E